ELOR - East Leeds Orbital Route
Leeds, UK
March 2021
The first ELOR bridge beams being readied for their journey via SPMT to their permanent location at Country Park.
Image: Balfour Beatty
Image: Balfour Beatty
Image: Balfour Beatty
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingo, Stockholm, SE
February 2021
Bridge construction continues, despite bitter weather.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

London Luton Airport Gateway
Luton, London UK
February 2021
Construction of the Luton DART continues to make progress, with the approach viaduct and Gateway Bridge nearing completion.
Image : Paul Baralos
Image : Paul Baralos
Image : Paul Baralos

Lilla Lidingöbron
Lidingo, Stockholm, SE
January 2021
The site team now face the challenges of cold weather working.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Walnut Footbridge
Guildford, UK
January 2021
Great to see progress fabricating our new footbridge for Guildford.
SH Structures
SH Structures
SH Structures
SH Structures
SH Structures
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Abbey-Chesterton Foot & Cycle Bridge
Cambridge, UK
November 2020
The 40m-long bridge being lifted into position over the River Cam.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingo, Stockholm, SE
October 2020
The grand job of placing the reinforcement for the next concrete span continues.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingö, Stockholm, SE
September 2020
Following the concrete works, the Movable Scaffolding System is broken down and the site prepared to repeat the process.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingö, Stockholm, SE
August 2020
Early August saw the casting of the first main span road deck.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingö, Stockholm, SE
August 2020
The deck trough and diaphragm is cast and preparation is underway to place the deck formwork.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingö, Stockholm, SE
July 2020
The first phase of concreting begins on the main span at the Ropsten abutment.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Abbey-Chesterton Foot & Cycle Bridge
Cambridge, UK
June 2020
Assembly of the superstructure approaches completion, ready for the installation lift over the River Cam.
Image: Simon Nuttall
Image: Hopsncheese
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingö, Stockholm, SE
June 2020
Concreting works continue well as the elegant form of Pier 3 is revealed.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Abbey-Chesterton Foot & Cycle Bridge
Cambridge, UK
May 2020
Three sections of the bridge - a key link in the first phase of the new Chisholm Trail - being transported to the assembly area beside the River Cam.
Image: SH Structures
Image: Cambridge Diary
Image: SH Structures
Image: Cam Cycle
Image: Cam Cycle

New Pooley Bridge
Pooley Bridge, Cumbria, UK
May 2020
Main span, comprising the pre-poured concrete arch and stainless steelwork, has been successfully lifted into place using an enormous 1,200 tonne mobile crane!
Image: Cumbria County Council & Eric Wright
Image: Cumbria County Council & Eric Wright
Image: Cumbria County Council & Eric Wright
Image: Cumbria County Council & Eric Wright
Image: Cumbria County Council & Eric Wright

Lilla Lidingöbron
Lidingö, Stockholm, SE
May 2020
Concreting works continue with 24-hour pours at caissons 3 and 4.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Arup
Image: VolkerFitzpatrick-Kier

Lilla Lidingöbron
Lidingö, Stockholm, SE
April 2020
The scale of the Movable Scaffolding System and also the journey it has ahead are equally impressive.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

New Pooley Bridge
Pooley Bridge, Cumbria, UK
April 2020
The reinforcement of the of the arch has been installed and the concrete poured. The steel plates that create the deck soffit are also in place.
Image: Eden Valley Drones UK
Image: Eden Valley Drones UK
Image: Eden Valley Drones UK
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingö, Stockholm, SE
March 2020
Piling of the pier supports continues in parallel with first concrete works on the pier.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingö, Stockholm, SE
February 2020
Assembly of the Movable Scaffolding System (MSS) reaches out from the Ropsten shoreline.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingö, Stockholm, SE
February 2020
Concreting works ‘at sea’ requires an impressive combination of planning and equipment.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

Lilla Lidingöbron
Lidingö, Stockholm, SE
December 2019
The supply and installation of the piles continues, with the longest over 50m in length
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading

A14 Footbridges
Bar Hill, Cambridgeshire, UK
December 2019
Basking in the winter sunshine, the landscaping of the bridges approaches are progressing well.
Image: Bo Vading
Image: Bo Vading

A14 Footbridges
Swavesey, Cambridgeshire, UK
September 2019
Victor Buyck Steel Construction installing the central span for Swavesey NMU bridge working as part of the A14 Integrated Delivery Team.

A465 Footbridges
September 2019
The sequence of footbridges crossing the A465, as it climbs through Clydach Gorge, nearing completion and weathering nicely.
Image: Patrick Hannay / Touchstone
Image: Patrick Hannay / Touchstone
Image: Patrick Hannay / Touchstone

New Pooley Bridge
Pooley Bridge, Cumbria, UK
September 2019
The temporary footbridge that will keep connectivity during construction was assembled and lifted and the existing temporary crossing then removed.
Image: Eden Valley Drones UK