Lilla Lidingöbron - In Progress - Bridges
Bo Vading
Bo Vading
Bo Vading
Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
![](https://cdn.knightarchitects.co.uk/assets/v20240722_142721/img/tile.png)
Lilla Lidingöbron
Lidingo, Stockholm, SE — July 2022
Work progresses on the tram spur in parallel with the main bridge fitting-out.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
![](https://cdn.knightarchitects.co.uk/assets/v20240722_142721/img/tile.png)
Lilla Lidingöbron
Lidingo, Stockholm, SE — June 2022
The installation of the bespoke lighting poles brings a sense of rhythm to the crossing.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
![](https://cdn.knightarchitects.co.uk/assets/v20240722_142721/img/tile.png)
Lilla Lidingöbron
Lidingo, Stockholm, SE — May 2022
Formworks construction for the tram line branch begins at the Torsvik landing.
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading
Image: Bo Vading